- Client: ARGE MBH OSZ Zollbrück
- Area: Floor area 2,900 m²
- Wood species: Emmental silver fir N1+R, rift-sawn/semi-rift-sawn, heavy timber
• Glulam 250 m³
• Framing lumber 27 m³
• Facade cladding, including battens 20 m³ - Surface treatment: Colorless pressure impregnation BKD 5
1 coat of AgingStain 300 on all sides - Completion: October 2025
- Architect: Rykart Architekten AG
- Photography: Oliver Jakob
The new Zollbrück Upper Secondary School is a forward-looking educational facility that combines education, architecture, and regional economic development. The existing school complex was expanded with a two-story addition featuring modern learning environments and a connecting structure. The goal was to make optimal use of the existing structures while simultaneously enhancing the facility—to create a more functional and attractive school environment with open learning spaces that promote flexible and self-directed learning.
The new building was constructed entirely of wood. All of the wood comes from the forests of the municipalities of Lauperswil and Rüderswil: The round timber was harvested locally during the winter of 2022–23, processed, and prepared for use in the construction. A total of 26 private forest owners at 20 locations supplied the material—ensuring short transport distances and sustainable value creation.
deligno ag was commissioned to install the facade cladding. The formwork was manufactured in Zollbrück and custom-designed with various profiles specifically for this project. They were then treated with a weathering glaze, which allows the facade to age beautifully and evenly and makes it virtually maintenance-free. The formwork was subsequently processed into facade elements. The horizontal and vertical organization of the facade draws on elements of the existing structure and reinterprets them in a contemporary architectural language. The load-bearing structure remains clearly visible both on the facade and inside, shaping the building’s spatial identity.
The outdoor areas also underwent a comprehensive upgrade. The new all-weather playground gives students the opportunity to be active and learn in any weather. The existing building was retrofitted to improve energy efficiency, modernized, and brought up to current safety and environmental standards.
The OSZ Zollbrück is considered a pilot project in the canton of Bern—and a prime example of how regional wood and modern learning spaces can work together successfully.









